U.S. ARMY GARRISON WEST POINT
West Point, New York
In September of 2019, American Water was awarded a 50-year contract to privatize the water and wastewater utilities of U.S. Army Garrison West Point, New York. Our responsibilities include system capital investment, regulatory and environmental compliance, planning, asset recapitalization, and long term operations and maintenance.
We will provide the water supply, treatment, storage, and distribution serving the installation’s 4,000 cadets, 580 academic staff, and other visitors. The U.S. Army Garrison West Point water system includes both the Stony Lonesome and Lusk Water Treatment Plants and the Lusk Reservoir, nearly 400,000 linear feet of water pipe, over 200 hydrants, 1,000 valves, and 12 tanks. The wastewater treatment and collection system and includes approximately 200,000 linear feet of pipe, 1000 manholes, and 6 lift stations, and wastewater treatment plants at Camp Buckner and Target Hill.
VENDOR INFORMATION AND FORMS
Target Hill Wastewater Treatment Plant (THWWTP) Upgrade Project Documents
STANDARD SPECIFICATIONS
Division 1 - General Requirements
Division 3 - Concrete
- 03 30 00 - Cast-In-Place Concrete
- 03 48 10 - Precast Concrete Manholes
- 03 48 20 - Valve Boxes and Meter Vaults
- 03 90 00 - Manhole Rehabilitation
Division 5 - Metals
Division 9 - Finishes
Division 22 - Plumbing
- 22 11 16.11 - Water Tap and Service Installation
- 22 11 16.13 - Cross Connection Control
- 22 13 19.23 - Grease Traps
- 22 13 20 - Oil/Water Separator
Division 25 - Integrated Automation
Division 26 - Electrical
- 26 00 10 - General Electrical Requirements
- 26 00 20 - Electrical Materials and Methods
- 26 29 33 - Variable Frequency Drives
- 26 32 13.13 - Emergency Generator
- 26 36 23 - Automatic Transfer Switch
Division 31 - Earthwork
- 31 11 00 - Clearing and Grubbing
- 31 23 23 - Utility Backfill Materials
- 31 23 33 - Excavation Backfill and Compaction for Utilities
- 31 50 00 - Casing Installation
Division 32 - Exterior Improvements
- 32 01 00 - Pavement Repair and Restoration
- 32 13 13 - Concrete Curb, Drives and Sidewalks
- 32 92 00 - Turf and Grasses
Division 33 - Utilities
- 33 01 10.13 - Pressure and Leakage Tests
- 33 01 10.15 - Disinfecting Pipeline
- 33 01 30.13 - Acceptance Testing for Sanitary Sewers
- 33 01 30.51 - Pumping and Bypassing
- 33 05 23.13 - Horizontal Directional Drilling
- 33 05 27 - Tracer Wire
- 33 05 29.11 - Stream Crossing
- 33 05 29.13 - Bridge Crossing
- 33 11 00 - Piping and Accessories - General Provisions
- 33 11 00.11 - Polyvinyl Chloride (PVC) Pipe
- 33 11 00.13 - High Density Polyethylene (HDPE) Pipe
- 33 11 00.15 - Ductile Iron Pipe and Fittings
- 33 11 00.17 - Polyethylene Wrap
- 33 11 00.19 - Abandonment of Water Mains
- 33 11 00.21 - Cured-In-Place Pipe
- 33 12 16.11 - Gate Valves
- 33 12 16.13 - Butterfly Valves
- 33 12 16.15 - Pressure Reducing Valves
- 33 12 16.17 - Tapping Sleeves and Valves
- 33 12 16.19 - Air Release Valves
- 33 12 19 - Fire Hydrants
- 33 12 33 - Water Meters
- 33 16 13 - Ground Storage Tanks
- 33 16 13.11 - Water Storage Tank Disinfection
- 33 16 13.12 - Water Storage Tank Removal
- 33 21 00 - Drinking Water Well Requirements
- 33 31 00.11 - Gravity Sanitary Sewers
- 33 31 00.13 - Abandonment of Sewer Mains
- 33 31 00.15 - Sanitary Sewer Laterals
- 33 32 16 - Packaged Sanitary Lift Stations
- 33 32 16.15 - Medium Sized Lift Stations
- 33 32 17 - Grinder Lift Stations
- 33 34 00 - Sanitary Sewer Force Mains
STANDARD DETAILS
General
- MSG-ST-01 - General Water and Sewer Construction Notes (1 of 2)
- MSG-ST-01A - General Water and Sewer Construction Notes (2 of 2)
- MSG-ST-02 - Trench Restoration
- MSG-ST-03 - Jack and Bore Detail
- MGS-ST-04 - Electrical Safety
- MSG-ST-05 - Required Separation between Water Mains and Sanitary Sewers
- MSG-ST-06 - Chain-Link Fence
- MSG-ST-07 - Concrete Encasement Detail
Wastewater
- MSG-WW-01 - Standard Small Lift Station Detail
- MSG-WW-02 - Standard Small Lift Station Electrical Plan
- MSG-WW-03 - Pump Station Details
- MSG-WW-04 - Emergency Pump Connection Detail
- MSG-WW-05 - Standard Medium Lift Station Typical Layout Detail
- MSG-WW-06 - (RESERVED)
- MSG-WW-07 - Clean Out Detail
- MSG-WW-08 - (RESERVED)
- MSG-WW-09 - Standard Precast Manhole Detail
- MSG-WW-10 - Typical Outside Drop Connection Detail
- MSG-WW-11 - Doghouse Manhole Detail
- MSG-WW-12 - Connection to Existing Manhole Detail
- MSG-WW-13 - Manhole Steps Detail
- MSG-WW-14 - Manhole Frame and Cover Detail
- MSG-WW-15 - Manhole Vent
- MSG-WW-16 - Sanitary Sewer Lateral Detail
- MSG-WW-17 ( RESERVED)
- MSG-WW-18 - Force Main Discharge Manhole
- MSG-WW-19 - Force Main Cleanout
- MSG-WW-19A - Force Main Dual Cleanout Detail
- MSG-WW-20 - Sewage Air Release Valve
- MSG-WW-21 - Grease Trap
Water
- MSG-W-01 - Water Service Installation for 2" Meters
- MSG-W-01A - Water Service Installation for Smaller than 2" Meters
- MSG-W-02 - Shallow Bury Air Release Valve Assembly Detail
- MSG-W-03 - Gate Valve Box Pad Detail
- MSG-W-04 - Concrete Valve Box Pad Detail
- MSG-W-05 - Tracer Wire for Non-Conductive Pipe Detail
- MSG-W-06 - Tapping Sleeve and Valve Detail
- MSG-W-07 - Fire Hydrant Detail
- MSG-W-08 - Thrust Block Details
- MSG-W-09 - 3" and Larger Meter Vault Detail
- MSG-W-10 - Fire Hydrant Construction Meter Detail
- MSG-W-11 -Yard Hydrant
- MSG-W-12 - (RESERVED)
- MSG-W-13 - Cutting-In Sleeve and Valve Installation Detail
- MSG-W-14 - Concrete Blocking Pad Detail
- MSG-W-15 - Blow-off Assembly Detail
- MSG-W-16 - Automatic Flushing Assembly Detail
- MSG-W-17 - 3/4"-2" DC Backflow Preventer - Exterior
- MSG-W-18 - 2" DC Backflow Preventer - Exterior
- MSG-W-19 - 3/4" - 2" DC Backflow Preventer - Interior
- MSG-W-20 - 2" DC Backflow Preventer - Interior
- MSG-W-21 - 3/4"-2" RPZ Backflow Preventer - Exterior
- MSG-W-22 - 2" RPZ Backflow Preventer - Exterior
- MSG-W-23 - 3/4" - 2" RPZ Backflow Preventer - Interior
- MSG-W-24 - 2" RPZ Backflow Preventer - Interior
- MSG-W-25A-HDPE Connection Restraints
- MSG-W-25B-HDPE Connection Restraints
- MSG-W-29- Above Ground Sampling Station
DESIGN GUIDE
Military Services Group Design Guide
STANDARD SPECIFICATIONS AND DETAILS REVISIONS LOG
ADDITIONAL DOCUMENTS
To contact West Point administrator or Project Manager, please email West.Point@amwater.com .